Work continues on the new rig.
Both Traction loss platforms are now completed.
Construction of the Surge platform is done and the actuator has been mounted.


Every connection is made as solid as possible.
These rigs are built to be strong and durable. I like to 'overbuild' where possible. You could literally jump up and down on the finished rig.

Next stage is to mount the Surge rails, then combine all the parts. 6 Actuators will then be built and connected. Servos to be connected and mounted in a cabinet before setup and calibration. Then there will be a testing phase before adding trim etc.